
High-rise forklifts are often used in high-rise shelf warehouses, high-rise warehouses, sorting, and other scenarios. Due to their large workload and high lifting frequency, regular replacement of wearing parts and standardized maintenance directly affect the operating stability and service life of the equipment. Many users are concerned about relevant replacement standards and cost references.
Common wearing parts replacement cycle
Walking system wearing parts
The walking system is in direct contact with the working ground, and the loss speed is highly correlated with the working environment. If it is used on indoor flat epoxy ground, the replacement cycle of polyurethane load-bearing wheels is usually 12 to 18 months. If there are sundries, unevenness or frequent entry and exit ramps on the working ground, the replacement cycle will be shortened to 8 to 12 months. The normal replacement cycle of driving wheel bushings, steering knuckle bearings and other components is 15 to 20 months. If there is any abnormal walking noise or steering card in daily use, it should be checked in time.
hydraulic system wearing parts
The hydraulic system is the core support for the lifting of the high gantry. The normal replacement cycle of seals and oil seals is 2 to 3 years. If the equipment is in a full-load and high-frequency operation state all year round, the replacement cycle can be adjusted to 1.5 to 2 years. The hydraulic oil filter element is recommended to be replaced every 6 to 8 months. The replacement cycle of hydraulic oil is 2 years or the cumulative working time reaches 2000 hours to avoid oil impurities from wearing the hydraulic pump and pipeline.
Door frame system wearing parts
The gantry roller bearings and chains are high-frequency stressed parts. The replacement cycle of roller bearings is usually 1.5 to 2 years. The lifting chain needs to be checked for tension and wear every 2000 working hours. The regular replacement cycle is 2.5 to 3 years. The replacement cycle of fork wear-resistant sleeves and gantry sliders is 12 to 18 months. When the lifting card and fork shake, it should be checked and replaced in advance.
Maintenance cost reference
Daily maintenance mainly includes monthly inspections, quarterly lubrication and tightening, and annual inspection of the whole machine. The average annual maintenance cost is usually between 1% and 2% of the equipment purchase cost, and there will be slight fluctuations under different operating intensities.
In terms of replacement cost of wearing parts, the single replacement cost of wearing parts of walking system varies from several hundred yuan to one thousand yuan depending on the material of the parts. Hydraulic system seal replacement plus labor cost is mostly around one thousand yuan per time. If the hydraulic oil and filter element need to be replaced at the same time, the total cost will increase slightly. The single cost of wearing parts of gantry system varies from several hundred yuan to two thousand yuan depending on the replacement parts.
Avoiding overloading operations, keeping the working floor clean, and regularly cleaning the door frame and walking system during daily use can effectively prolong the service life of wearing parts, reduce long-term maintenance costs, and promptly check and deal with minor faults to avoid higher maintenance expenses due to the expansion of faults.
简体中文
English
繁体中文
Deutsch
日本語
한국어
Tiếng Việt
Русский
ไทย
Bahasa Indonesia
Bahasa Melayu
Filipino
لالعربية
Français


