Key points of battery life measurement of 1.8-ton electric forklift
Battery life test scenarios and benchmark settings
This test selects general storage operation scenarios, covering short-distance handling, pallet stacking and other routine operations, the testing environment temperature is stable at about 25 ° C, the forklift maintains a rated load of 1.8 tons, and the operating time from full power to low power warning (about 10% of the remaining power) is the core data to ensure that the test results fit the actual use scenario needs, avoid extreme environmental or special working conditions interference, and ensure the practicality and reference of the data.
Measured charging time of electric forklift
The measured data of the supplementary energy stage
The test covers two mainstream energy replenishment methods of conventional fast charging and slow charging. The fast charging stage is charged from 10% to 80%, and the actual time is about 1.2 hours. During this period, the charging rate is stable and does not fluctuate; the slow charging is charged from 10% to 100%. It takes about 4.5 hours. The replenishment process does not experience abnormal interruptions or false power standards, which meets the basic energy replenishment performance of industrial electric forklifts, and can be adapted to the replenishment needs of most operating scenarios.
Practical application value of measured reference
The measured data can be used as a reference for warehousing, logistics transshipment, and other scenarios. Users can plan the replenishment time reasonably according to their own operation intensity, so as to avoid interrupting the operation due to insufficient power, and there is no need to over-reserve the waiting time for replenishment. This takes into account the continuity of the operation and the adaptability of the equipment to help improve the overall efficiency of the site operation.
简体中文
English
繁体中文
Deutsch
日本語
한국어
Tiếng Việt
Русский
ไทย
Bahasa Indonesia
Bahasa Melayu
Filipino
لالعربية
Français

