Key points of basic preliminary research before purchasing
Verify the actual operating condition attributes
Before purchasing, first sort out the core scenarios of daily operations, such as whether it is flat storage and transshipment, or whether it requires frequent stacking operations, count the average daily operation time, channel width, and regular load of goods, and synchronously confirm whether the operating environment is an indoor constant temperature space or a semi-outdoor dust and low temperature area. These basic parameters are the core prerequisites for selection. Do not blindly refer to the general configuration to make decisions to avoid subsequent problems that do not fit the model and the operation scene.
Adaptation scenarios and purchase precautions of CPD20 models
core configuration matching logic
This model focuses on counterweight operation attributes, with sufficient stacking capacity, and is suitable for most storage scenarios that require stacking within 3 meters. When purchasing, it is necessary to confirm whether the lithium battery life parameters match the daily operating time requirements, and understand in advance the after-sales door-to-door maintenance response time, as well as the daily maintenance-related service content corresponding to the battery, to ensure the continuity of subsequent operations.
Adaptation scenarios and purchase precautions for ECB20 models
Core Reference for Scene Adaptation
This model has a more compact body design, a smaller turning radius, and is suitable for storage and transfer scenarios with narrow passages. When purchasing, it is necessary to focus on checking whether the width of the body is suitable for the passage requirements of existing operation channels, understand the installation guidance services of charging supporting facilities, and confirm the supply timeliness of subsequent wearing parts to avoid problems such as limited passage and untimely supply of accessories in subsequent operations.
General purchase pit avoidance tips for the two models
Full-cycle cost accounting reference
In the procurement process, do not only refer to the price of the whole machine, but also comprehensively consider the cost of the whole life cycle, including subsequent energy consumption costs and maintenance costs. Priority should be given to the configuration that meets the actual needs of your own operation, and do not pay extra costs for redundant unnecessary functions. At the same time, it is necessary to confirm the formal procurement channels to ensure the subsequent rights and interests of various services.